This paper considers the problem of production planning of unreliable batch processing manufacturing systems. The finished goods are produced in lots, and are then transported to a storage area in order to continuously meet a constant demand rate. The main objective of this work is to jointly determine the optimal lot sizing and optimal production control policy that minimise the total expected cost of inventory/backlog and transportation, over an infinite time horizon. The decision variables are the lot sizing and the production rate. The problem is formulated with a stochastic dynamic programming model and the impulse control theory is applied to establish the Hamilton–Jacobi–Bellman (HJB) equations. Based on a numerical resolution of the HJB equations, it is shown that the optimal control policy is governed by a base stock policy for production rate control and economic lot size for batch processing. A thorough analysis and practical issues are addressed with a simulation-based approach. Thus, a combined discrete–continuous simulation model is developed to determine the optimal parameters of the proposed policy when the failure and repair times follow general distributions. The results are illustrated with numerical examples and confirmed through sensitivity analysis.Keywords
This publication has 30 references indexed in Scilit:
- Joint replenishment and manufacturing activities control in a two stage unreliable supply chainInternational Journal of Production Research, 2009
- An analytical approach for performance evaluation and optimization of a two-stage production-distribution systemInternational Journal of Production Research, 2008
- Impulsive controlIEEE Transactions on Automatic Control, 1999
- Experimental design in production and maintenance control problem of a single machine, single product manufacturing systemInternational Journal of Production Research, 1999
- Bounds for production lot sizing with machine breakdownsComputers & Industrial Engineering, 1997
- A simple approximation of the EMQ model with Poisson machine failuresProduction Planning & Control, 1997
- An extended optimal lot sizing model with an unreliable machineProduction Planning & Control, 1997
- Scheduling job shops with delaysInternational Journal of Production Research, 1991
- Production control of a manufacturing system with multiple machine statesIEEE Transactions on Automatic Control, 1988
- Optimal control of production rate in a failure prone manufacturing systemIEEE Transactions on Automatic Control, 1986