Evaluating the effects of capacity constraints and demand patterns on supply chain replenishment strategies
Authors:
- 1 November 2006
- journal article
- research article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 44 (21) , 4607-4629
Abstract
This research considers inventory replenishment in a stochastic, multi-echelon supply chain involving both production and distribution functions. Simulation is used to compare distribution/material requirements planning (DRP/MRP), re-order point (ROP) and Kanban (KBN) replenishment strategies. Additional experimental factors include the demand pattern and the existence of manufacturing capacity constraints. Trade-off curves between inventory and delivery performance are generated. Statistical techniques, including analysis of variance (ANOVA), are then used to compare the areas under the trade-off curves and determine the relative dominance among the replenishment strategies. The methodology is used to identify both main and interaction effects. With seasonal demand, DRP/MRP performance is found to be best, followed by ROP and KBN, respectively. Without seasonal demand, the relative performance ranking depends on the presence of capacity constraints. Without capacity constraints, ROP performs best, followed by DRP/MRP and KBN. With capacity constraints, the ranking is reversed. This difference in behaviour can be explained using queuing analysis.Keywords
This publication has 12 references indexed in Scilit:
- Optimal Lot-Sizing with Capacity-Constraints and Auto-Correlated Interarrival Times2005
- A simulation test bed for production and supply chain modeling2004
- Use of GI/G/1 queuing approximations to set tactical parameters for the simulation of MRP systems2003
- A comparison of Reorder Point and Kanban policies for a single machine production systemProduction Planning & Control, 1998
- From CAN-Q to MPX: Evolution of Queuing Software for ManufacturingInterfaces, 1995
- Multi-level production-inventory control: Material requirements planning or reorder point policies?European Journal of Operational Research, 1994
- An analytical framework for comparing material requirements planning to reorder point systemsEuropean Journal of Operational Research, 1994
- A Comparison of Reorder Point and Material Requirements Planning Inventory Control Logic*Decision Sciences, 1992
- A comparative analysis of an MRP lot-for-lot system and a Kanban system for a multistage production operationInternational Journal of Production Research, 1989
- The Queueing Network AnalyzerBell System Technical Journal, 1983