Long-term turnaround planning for integrated chemical sites
Authors:
- Satyajith AmaranSASatyajith Amaran
- Nikolaos V. SahinidisNSNikolaos V. Sahinidis
- Bikram ShardaBSBikram Sharda
- Matt MorrisonMMMatt Morrison
- Scott J. BurySBScott J. Bury
- Scott MillerSMScott Miller
- John M. WassickJWJohn M. Wassick
- 1 January 2015
- journal article
- Published by Elsevier in Computers & Chemical Engineering
- Vol. 72, 145-158
Abstract
No abstract availableFunding Information
- The Dow Chemical Company
This publication has 39 references indexed in Scilit:
- Maintenance scheduling and production control of multiple-machine manufacturing systemsComputers & Industrial Engineering, 2005
- Optimal Preventive Maintenance Scheduling in Semiconductor ManufacturingIEEE Transactions on Semiconductor Manufacturing, 2004
- Interactions of Maintenance and Production Planning for Multipurpose Process PlantsA System Effectiveness ApproachIndustrial & Engineering Chemistry Research, 2001
- COMBINED PRODUCTION AND MAINTENANCE SCHEDULING FOR A MULTIPLE‐PRODUCT, SINGLE‐ MACHINE PRODUCTION SYSTEMProduction and Operations Management, 2000
- A dynamic approach for aircraft assignment and maintenance scheduling by airlinesJournal of Air Transport Management, 2000
- Cyclic scheduling of continuous parallel‐process units with decaying performanceAIChE Journal, 1998
- Preventive maintenance policy optimisation for multipurpose plant equipmentComputers & Chemical Engineering, 1995
- Optimal Short-Term Scheduling of Maintenance and Production for Multipurpose PlantsIndustrial & Engineering Chemistry Research, 1995
- Maintenance scheduling by using simulated annealing method (for power plants)IEEE Transactions on Power Systems, 1991
- An Operational Research Approach to Breakdown Maintenance: Problem RecognitionJournal of the Operational Research Society, 1983