Optimal level schedules for mixed-model, multi-level just-in-time assembly systems
Authors:
- Wieslaw KubiakWKWieslaw Kubiak
- George SteinerGSGeorge Steiner
- Julian Scott YeomansJYJulian Scott Yeomans
- 1 January 1997
- journal article
- research article
- Published by Springer Nature in Annals of Operations Research
- Vol. 69, 241-259
Abstract
No abstract availableKeywords
This publication has 12 references indexed in Scilit:
- Optimal just-in-time schedules for flexible transfer linesInternational Journal of Flexible Manufacturing Systems, 1994
- Minimizing variation of production rates in just-in-time systems: A surveyEuropean Journal of Operational Research, 1993
- Developing production schedules which balance part usage and smooth production loads for just‐in‐time production systemsNaval Research Logistics (NRL), 1991
- Note—Sequencing JIT Mixed-Model Assembly LinesManagement Science, 1991
- A Note on “Level Schedules for Mixed-Model Assembly Lines in Just-in-Time Production Systems”Management Science, 1991
- A dynamic programming algorithm for scheduling mixed-model, just-in-time production systemsMathematical and Computer Modelling, 1990
- Scheduling mixed-model multi-level just-in-time production systemsInternational Journal of Production Research, 1989
- Level Schedules for Mixed-Model Assembly Lines in Just-In-Time Production SystemsManagement Science, 1989
- Final assembly sequencing for just-in-time manufacturingInternational Journal of Production Research, 1989
- A heuristic algorithm for the assembly line model-mix sequencing problem to minimize the risk of stopping the conveyorInternational Journal of Production Research, 1979