Scheduling of a two-stage differentiation flowshop to minimize weighted sum of machine completion times
Authors:
- T.C.E. ChengTCT.C.E. Cheng
- B.M.T. LinBLB.M.T. Lin
- Y. TianYTY. Tian
- 1 November 2009
- journal article
- Published by Elsevier in Computers & Operations Research
- Vol. 36 (11) , 3031-3040
Abstract
No abstract availableKeywords
This publication has 19 references indexed in Scilit:
- Johnson’s rule, composite jobs and the relocation problemEuropean Journal of Operational Research, 2009
- Permutation flowshop scheduling problems with time lags to minimize the weighted sum of machine completion timesInternational Journal of Production Economics, 2008
- A note on parallel-machine scheduling with deteriorating jobsJournal of the Operational Research Society, 2007
- Mass customization: Literature review and research directionsInternational Journal of Production Economics, 2001
- Heuristics for the two-stage job shop scheduling problem with a bottleneck machineEuropean Journal of Operational Research, 2000
- An exact algorithm for batching and scheduling two part types in a mixed shop: A technical noteInternational Journal of Production Economics, 1998
- Flowshop scheduling with dominant machinesComputers & Operations Research, 1995
- The Lessons of Flowshop Scheduling ResearchOperations Research, 1992
- TWO-MACHINE SCHEDULING UNDER REQUIRED PRECEDENCE AMONG JOBSJournal of the Operations Research Society of Japan, 1976
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954