An improved branch and bound algorithm for single machine scheduling with deadlines to minimize total weighted completion time
Author:
- Yunpeng PanYPYunpeng Pan
- 1 November 2003
- journal article
- research article
- Published by Elsevier in Operations Research Letters
- Vol. 31 (6) , 492-496
Abstract
No abstract availableKeywords
This publication has 10 references indexed in Scilit:
- A note on the single‐machine scheduling problem with minimum weighted completion time and maximum allowable tardinessNaval Research Logistics Quarterly, 1986
- Minimizing Weighted Completion Times with DeadlinesOperations Research, 1985
- An algorithm for single machine sequencing with deadlines to minimize total weighted completion timeEuropean Journal of Operational Research, 1983
- Single machine scheduling to minimize weighted sum of completion times with secondary criterion — A branch and bound approachEuropean Journal of Operational Research, 1980
- Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey1979
- Complexity of Machine Scheduling Problems1977
- Scheduling to minimize the weighted sum of completion times with secondary criteriaNaval Research Logistics Quarterly, 1976
- A note on a scheduling problem with dual criteriaNaval Research Logistics Quarterly, 1975
- A note on the extension of a result on scheduling with secondary criteriaNaval Research Logistics Quarterly, 1972
- Various optimizers for single‐stage productionNaval Research Logistics Quarterly, 1956