Time-Lagged Ensemble Quantitative Precipitation Forecasts for Three Landfalling Typhoons in the Philippines Using the CReSS Model, Part I: Description and Verification against Rain-Gauge Observations
Open Access
- 28 July 2022
- journal article
- research article
- Published by MDPI AG in Atmosphere
- Vol. 13 (8) , 1193
Abstract
In this study, the 2.5 km Cloud-Resolving Storm Simulator was applied to forecast the rainfall by three landfalling typhoons in the Philippines at high resolution: Mangkhut (2018), Koppu (2015), and Melor (2015), using a time-lagged strategy for ensemble. The three typhoons penetrated northern Luzon, central Luzon, and the middle of the Philippine Archipelago, respectively, and the present study verified the track and quantitative precipitation forecasts (QPFs) using categorical statistics against observations at 56 rain-gauge sites at seven thresholds up to 500 mm. The predictability of rainfall is the highest for Koppu, followed by Melor, and the lowest for Mangkhut, which had the highest peak rainfall amount. Targeted at the most-rainy 24 h of each case, the threat score (TS) within the short range (≤72 h) could reach 1.0 for Koppu at 350 mm in many runs (peak observation = 502 mm), and 1.0 for Mangkhut and 0.25 for Melor (peak observation = 407 mm) both at 200 mm in the best member, when the track errors were small enough. For rainfall from entire events (48 or 72 h), TS hitting 1.0 could also be achieved regularly at 500 mm for Koppu (peak observation = 695 mm), and 0.33 at 350 mm for Melor (407 mm) and 0.46 at 200 mm for Mangkhut (786 mm) in the best case. At lead times beyond the short range, one third of these earlier runs also produced good QPFs for both Koppu and Melor, but such runs were fewer for Mangkhut and the quality of QPFs was also not as high due to larger northward track biases. Overall, the QPF results are very encouraging, and comparable to the skill level for typhoon rainfall in Taiwan (with similar peak rainfall amounts). Thus, at high resolution, there is a fair chance to make decent QPFs even at lead times of 3–7 days before typhoon landfall in the Philippines, with useful information on rainfall scenarios for early preparation.Keywords
Funding Information
- Ministry of Science and Technology (MOST) of Taiwan (MOST-109-2923-M-002-008, MOST-110-2923-M-002-006, MOST-110-2111-M-003-004, MOST-110-2625-M-003-001, PMIS ID No. 3566)
- Department of Science and Technology−Philippine Council for Industry, Energy and Emerging Technology Research and Development (DOST—PCIEERD) of the Philippines (MOST-109-2923-M-002-008, MOST-110-2923-M-002-006, MOST-110-2111-M-003-004, MOST-110-2625-M-003-001, PMIS ID No. 3566)
This publication has 68 references indexed in Scilit:
- Predicting Typhoon Morakot’s Catastrophic Rainfall with a Convection-Permitting Mesoscale Ensemble SystemWeather and Forecasting, 2010
- Sensitivity of Simulated Tropical Cyclone Structure and Intensity to Horizontal ResolutionMonthly Weather Review, 2010
- Introduction of the GSI into the NCEP Global Data Assimilation SystemWeather and Forecasting, 2009
- Interdecadal variability of tropical cyclone landfall in the Philippines from 1902 to 2005Geophysical Research Letters, 2009
- Visualizing Multiple Measures of Forecast QualityWeather and Forecasting, 2009
- Characteristics of rainfall during tropical cyclone periods in TaiwanNatural Hazards and Earth System Sciences, 2008
- Short-Range Precipitation Forecasts from Time-Lagged Multimodel Ensembles during the HMT-West-2006 CampaignJournal of Hydrometeorology, 2008
- Improving short‐range high‐resolution model precipitation forecast skill using time‐lagged ensemblesQuarterly Journal of the Royal Meteorological Society, 2007
- Quantitative precipitation forecasting in the UKJournal of Hydrology, 2000
- Ensemble Forecasting at NMC: The Generation of PerturbationsBulletin of the American Meteorological Society, 1993