Optimizing multi-stage production with constant lot size and varying number of unequal sized batches
Authors:
- Ronald W BogaschewskyRBRonald W Bogaschewsky
- Udo D BuscherUBUdo D Buscher
- Gerd LindnerGLGerd Lindner
Abstract
No abstract availableKeywords
This publication has 11 references indexed in Scilit:
- A constant lot size model with equal and unequal sized batch shipments between production stagesEngineering Costs and Production Economics, 1986
- Multi-stage production with variable lot sizes and transportation of partial lotsEuropean Journal of Operational Research, 1984
- Optimizing multi-stage production with constant lot size and varying numbers of batchesOmega, 1980
- A Comment on Determination of Optimum Production Quantity for a Two-stage Production SystemJournal of the Operational Research Society, 1978
- Economic batch quantity in a multi-stage production systemInternational Journal of Production Research, 1978
- Determination of Optimum Production Quantity for a Two-Stage Production SystemJournal of the Operational Research Society, 1977
- Note—On the Optimality of Sub-Batch Sizes for a Multi-Stage EPQ Model—A RejoinderManagement Science, 1976
- Note—Note on “Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity Model”Management Science, 1976
- Manufacturing Cycle Time Determination for a Multi-Stage Economic Production Quantity ModelManagement Science, 1975
- Optimal and System Myopic Policies for Multi-Echelon Production/Inventory Assembly SystemsManagement Science, 1975