Intelligent floor plan design of modular high-rise residential building based on graph-constrained generative adversarial networks
Authors:
- Jiepeng LiuJLJiepeng Liu
- Zijin QiuZQZijin Qiu
- Lufeng WangLWLufeng Wang
- Pengkun LiuPLPengkun Liu
- Guozhong ChengGCGuozhong Cheng
- Yan ChenYCYan Chen
Top Cited Papers
- 16 January 2024
- journal article
- research article
- Published by Elsevier in Automation in Construction
- Vol. 159
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China (52130801)
- Chongqing Municipal Science and Technology Bureau (CSTB2022TIAD-KPX0136)
This publication has 47 references indexed in Scilit:
- Customization and generation of floor plans based on graph transformationsAutomation in Construction, 2018
- Economic Analysis of Design Errors in BIM-Based High-Rise Construction Projects: Case Study of Haeundae L ProjectJournal of Construction Engineering and Management, 2018
- Graph theory based representation of building information models for access control applicationsAutomation in Construction, 2016
- Constraint-aware interior layout exploration for pre-cast concrete-based buildingsThe Visual Computer, 2013
- Application of Modular Construction in High-Rise BuildingsJournal of Architectural Engineering, 2012
- Design Error Costs in Construction ProjectsJournal of Construction Engineering and Management, 2012
- The Consequences of Living in High-Rise BuildingsArchitectural Science Review, 2007
- An agent approach to supporting collaborative design in 3D virtual worldsAutomation in Construction, 2005
- Review : Knowledge Management and Knowledge Management Systems: Conceptual Foundations And Research Issues1,2MIS Quarterly, 2001
- Precedents in design: a computational model for the organization of precedent knowledgeDesign Studies, 1994