A review of recent theoretical development in scheduling dual-gripper robotic cells
Authors:
- 21 November 2017
- journal article
- review article
- Published by Taylor & Francis in International Journal of Production Research
- Vol. 56 (1-2) , 817-847
Abstract
No abstract availableKeywords
This publication has 85 references indexed in Scilit:
- A note on productivity gains in flexible robotic cellsInternational Journal of Flexible Manufacturing Systems, 2005
- Cyclic scheduling in a robotic production lineJournal of Scheduling, 2002
- Scheduling in dual gripper robotic cells for productivity gainsIEEE Transactions on Robotics and Automation, 2001
- Parallel machine scheduling with a common serverDiscrete Applied Mathematics, 2000
- Optimal sequencing of double-gripper gantry robot moves in tightly-coupled serial production systemsIEEE Transactions on Robotics and Automation, 1996
- DETERMINING OPTIMAL CYCLIC HOIST SCHEDULES IN A SINGLE-HOIST ELECTROPLATING LINEIIE Transactions, 1994
- Single-wafer cluster tool performance: an analysis of throughputIEEE Transactions on Semiconductor Manufacturing, 1994
- Stochastic modelling and comparisons of two flexible manufacturing cells with single and double gripper robotsInternational Journal of Production Research, 1993
- Sequencing of parts and robot moves in a robotic cellInternational Journal of Flexible Manufacturing Systems, 1992
- Hoist Scheduling For A PCB Electroplating FacilityIIE Transactions, 1988