Claims management in the Egyptian industrial construction sector: a contractor's perspective
Authors:
- 5 September 2008
- journal article
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 15 (5) , 456-469
Abstract
Purpose – This research aims at providing a better insight of the status of claims management in general, and change order claims in particular, from the contractor's perspective with respect to the Egyptian industrial construction sector, as they proved to be the main cause of claims in this sector. Design/methodology/approach – A questionnaire survey discussing the most persistent issues of claims management in general, and change order claims in particular, was conducted on a selected sample of construction industrial companies. Findings – The results demonstrated that claims management in the Egyptian industrial sector has been suffering from a variety of obstacles, including lack of proper notification procedures in public contracts and poor documentation management. Change orders had been actually lost due to poor documentation. Oral change orders were present in approximately 76 per cent of the projects; half of which resulted in loss of rights due to improper documentation, which was largely attributed to the lack of contract awareness of the site team, and to the “fear of consultant phenomenon”. Practical implications – The paper presented several recommendations for improving claims management including: the formation of a standard form of contract general conditions for the Egyptian industrial sector, and applying a methodological approach for change orders quantification. Originality/value – The increasing number of international companies contemplating construction projects in Egypt, and the significant problems with regards to claims propagation and management, addressed the need to conduct such study that targets one of the most challenging areas in the Egyptian construction industry.Keywords
This publication has 10 references indexed in Scilit:
- Impact of Change Orders on Labor Efficiency for Electrical ConstructionJournal of Construction Engineering and Management, 1999
- Impact of Change Orders on Labor Efficiency for Mechanical ConstructionJournal of Construction Engineering and Management, 1999
- Improving the management of claims on construction contracts: consultant's perspectiveConstruction Management and Economics, 1998
- Construction Claims and Disputes: Causes and Cost/Time OverrunsJournal of Construction Engineering and Management, 1994
- Contractors' Construction‐Claims AvoidanceJournal of Construction Engineering and Management, 1994
- “Claimsmanship”: Current PerspectiveJournal of Construction Engineering and Management, 1993
- Causes of Quality Deviations in Design and ConstructionJournal of Construction Engineering and Management, 1992
- Records Management in Engineering FirmsJournal of Management in Engineering, 1991
- Legal Aspects of Oral Change OrdersJournal of Construction Engineering and Management, 1991
- Construction Claims: Frequency and SeverityJournal of Construction Engineering and Management, 1985