Effect of adverse geological condition on TBM operation in Ghomroud tunnel conveyance project
Authors:
- Ebrahim FarrokhEFEbrahim Farrokh
- 1 July 2009
- journal article
- Published by Elsevier in Tunnelling and Underground Space Technology
- Vol. 24 (4) , 436-446
Abstract
No abstract availableKeywords
This publication has 3 references indexed in Scilit:
- Correlation of tunnel convergence with TBM operational parameters and chip size in the Ghomroud tunnel, IranTunnelling and Underground Space Technology, 2008
- Big Tunnels in Bad RockJournal of Geotechnical and Geoenvironmental Engineering, 2001
- Advance rates of hard rock TBMs and their effects on project economicsTunnelling and Underground Space Technology, 2000