Efficient heuristic for solving non-permutation flow-shop scheduling problems with maximal and minimal time lags
Authors:
- Song YeSYSong Ye
- Ning ZhaoNZNing Zhao
- Kaidian LiKLKaidian Li
- Chuanjin LeiCLChuanjin Lei
- 1 November 2017
- journal article
- Published by Elsevier in Computers & Industrial Engineering
- Vol. 113, 160-184
Abstract
No abstract availableFunding Information
- National Natural Science Foundation of China (71301008)
- Natural Science Foundation of Beijing Municipality (9144030)
This publication has 20 references indexed in Scilit:
- Lexicographic optimization of a permutation flow shop scheduling problem with time lag constraintsInternational Transactions in Operational Research, 2013
- Generalized disjunctive constraint propagation for solving the job shop problem with time lagsEngineering Applications of Artificial Intelligence, 2011
- A memetic algorithm for the job-shop with time-lagsComputers & Operations Research, 2008
- Permutation flowshop scheduling problems with maximal and minimal time lagsComputers & Operations Research, 2006
- Complexity Results for Flow-Shop and Open-Shop Scheduling Problems with Transportation DelaysAnnals of Operations Research, 2004
- Single machine scheduling with chain: structured precedence constraints and separation time windowsIEEE Transactions on Robotics and Automation, 1996
- Search heuristics for a flowshop scheduling problem in a printed circuit board assembly processEuropean Journal of Operational Research, 1996
- A Microcomputer Based Solution to a Practical Scheduling ProblemJournal of the Operational Research Society, 1985
- A General Bounding Scheme for the Permutation Flow-Shop ProblemOperations Research, 1978
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954