Design and implementation of construction cost prediction model based on SVM and LSSVM in industries 4.0
Authors:
Top Cited Papers
- 6 January 2021
- journal article
- research article
- Published by Emerald Publishing in International Journal of Intelligent Computing and Cybernetics
- Vol. 14 (2) , 145-157
Abstract
Purpose: In order to improve the accuracy of project cost prediction, considering the limitations of existing models, the construction cost prediction model based on SVM (Standard Support Vector Machine) and LSSVM (Least Squares Support Vector Machine) is put forward.Design/methodology/approach: In the competitive growth and industries 4.0, the prediction in the cost plays a key role.Findings: At the same time, the original data is dimensionality reduced. The processed data are imported into the SVM and LSSVM models for training and prediction respectively, and the prediction results are compared and analyzed and a more reasonable prediction model is selected.Originality/value: The prediction result is further optimized by parameter optimization. The relative error of the prediction model is within 7%, and the prediction accuracy is high and the result is stable.Keywords
This publication has 10 references indexed in Scilit:
- A novel construction cost prediction model using hybrid natural and light gradient boostingAdvanced Engineering Informatics, 2020
- Blockchain Based Smart Contracts for Internet of Medical Things in e-HealthcareElectronics, 2020
- Prediction Model of Shield Performance During Tunneling via Incorporating Improved Particle Swarm Optimization Into ANFISIEEE Access, 2020
- Prediction Model for Mechanical Properties of Lightweight Aggregate Concrete Using Artificial Neural NetworkMaterials, 2019
- Modelling Construction Site Cost Index Based on Neural Network EnsemblesSymmetry, 2019
- Design of building construction safety prediction model based on optimized BP neural network algorithmSoft Computing, 2019
- A machine learning approach for cost prediction analysis in environmental governance engineeringNeural Computing and Applications, 2018
- Construction cost prediction model for conventional and sustainable college buildings in North AmericaJournal of Taibah University for Science, 2017
- The development of a construction cost prediction model with improved prediction capacity using the advanced CBR approachExpert Systems with Applications, 2011
- A STUDY ON THE DEVELOPMENT OF A COST MODEL BASED ON THE OWNER'S DECISION MAKING AT THE EARLY STAGES OF A CONSTRUCTION PROJECTInternational Journal of Strategic Property Management, 2010