Parallel machines scheduling to minimize job tardiness and machine deteriorating cost with deteriorating jobs
Authors:
- Mohammad Mahdavi MazdehMMMohammad Mahdavi Mazdeh
- Farzad ZaerpourFZFarzad Zaerpour
- Abalfazl ZareeiAZAbalfazl Zareei
- Ali HajinezhadAHAli Hajinezhad
- 1 June 2010
- journal article
- Published by Elsevier in Applied Mathematical Modelling
- Vol. 34 (6) , 1498-1510
Abstract
No abstract availableThis publication has 17 references indexed in Scilit:
- Scheduling a capacitated single machine with time deteriorating job valuesInternational Journal of Production Economics, 2008
- Single machine scheduling with simple linear deterioration to minimize total absolute deviation of completion timesComputers & Operations Research, 2008
- Scheduling jobs on parallel machines with setup times and ready timesComputers & Industrial Engineering, 2008
- Parallel machine scheduling with almost periodic maintenance and non-preemptive jobs to minimize makespanComputers & Operations Research, 2008
- Single-machine scheduling problems with the effects of learning and deteriorationOmega, 2007
- Parallel machine selection and job scheduling to minimize machine cost and job tardinessComputers & Operations Research, 2005
- Minimizing the total completion time in single-machine scheduling with step-deteriorating jobsComputers & Operations Research, 2005
- A condition-based maintenance policy for stochastically deteriorating systemsReliability Engineering & System Safety, 2002
- Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up timesInternational Journal of Production Research, 2000
- Job sequencing rules for minimizing the expected makespan in flexible machinesEuropean Journal of Operational Research, 1997