Post-Pareto optimality approach to enhance budget allocation process for bridge rehabilitation management
- 18 November 2014
- journal article
- research article
- Published by Taylor & Francis in Structure and Infrastructure Engineering
- Vol. 11 (12) , 1565-1582
Abstract
A variety of conflicting criteria in the form of objective functions exist in budget allocation optimisation problem for bridge rehabilitation projects. Budget allocation decision-making for such transportation assets is generally a combinatorial problem. The nature of the problem is a good reason for decision-makers to apply multi-objective optimisation techniques. However, manually choosing an acceptable solution from a set of optimal solutions is a time-consuming task, which would be avoided if the optimisation technique could be followed by a ranking method to obtain unique acceptable solution. To enhance the budget allocation process, this paper develops a posteriori approach to prioritise Pareto-Optimal (PO) solutions generated by genetic algorithm in order to identify a unique package of bridge rehabilitation activities. By identifying the most conventional objective functions for bridge rehabilitation based on technical and managerial criteria, a multi-objective knapsack problem is constructed. PO solutions will then be prioritised applying ‘Technique for Order Preference by Similarity to an Ideal Solution’. The feasibility of the study will be finally demonstrated through an illustrative example. The proposed ranking approach may facilitate the budget allocation optimisation process for bridge rehabilitation where one or a few acceptable solutions are demanded.Keywords
This publication has 52 references indexed in Scilit:
- Life-cycle cost of civil infrastructure with emphasis on balancing structural performance and seismic risk of road networkStructure and Infrastructure Engineering, 2011
- Seismic vulnerability of lifelines in the greater Lisbon areaBulletin of Earthquake Engineering, 2009
- Economic evaluation model for post-earthquake bridge repair/rehabilitation: Taiwan case studiesAutomation in Construction, 2009
- Multi-objective scheduling problems: Determination of pruned Pareto setsIIE Transactions, 2008
- GA-based algorithm for selecting optimal repair and rehabilitation methods for reinforced concrete (RC) bridge decksAutomation in Construction, 2007
- Pareto Analysis for Multicriteria Optimization of Bridge Preservation DecisionsTransportation Research Record: Journal of the Transportation Research Board, 2007
- Optimal bridge maintenance planning using improved multi-objective genetic algorithmStructure and Infrastructure Engineering, 2006
- Bridge Annual Maintenance Prioritization under Uncertainty by Multiobjective Combinatorial OptimizationComputer-Aided Civil and Infrastructure Engineering, 2005
- DESIGNING BIORESERVE NETWORKS TO SATISFY MULTIPLE, CONFLICTING DEMANDSEcological Applications, 1999
- A Reconciliation Among Discrete Compromise SolutionsJournal of the Operational Research Society, 1987