Predicting construction time and cost of tunnels using Markov chain model considering opinions of experts
- 1 October 2021
- journal article
- research article
- Published by Elsevier in Tunnelling and Underground Space Technology
- Vol. 116, 104109
Abstract
No abstract availableKeywords
This publication has 23 references indexed in Scilit:
- Forecasting sidewall displacement of underground caverns using machine learning techniquesAutomation in Construction, 2021
- Resource scheduling and planning for tunneling with a new resource model of the Decision Aids for Tunneling (DAT)Tunnelling and Underground Space Technology, 2016
- System probabilistic stability analysis of soil slopes using Gaussian process regression with Latin hypercube samplingComputers and Geotechnics, 2015
- Probabilistic estimation of ground condition and construction cost for mountain tunnelsTunnelling and Underground Space Technology, 2014
- Combining Electrical Resistivity Tomography and Ground Penetrating Radar to study geological structuring of karst Unsaturated ZoneJournal of Applied Geophysics, 2013
- Probabilistic prediction of tunnel geology using a Hybrid Neural-HMMEngineering Applications of Artificial Intelligence, 2011
- Experimental estimation of the fallout size and reinforcement design of a tunnel under excavationTunnelling and Underground Space Technology, 2010
- Predicting geological hazards during tunnel constructionJournal of Rock Mechanics and Geotechnical Engineering, 2010
- Design a new intelligence expert decision making using game theory and fuzzy AHP to risk management in design, construction, and operation of tunnel projects (case studies: Resalat tunnel)The International Journal of Advanced Manufacturing Technology, 2010
- Quantitative risk evaluation based on event tree analysis technique: Application to the design of shield TBMTunnelling and Underground Space Technology, 2009