Multi-objective production scheduling optimization and management control system of complex aerospace components: a review
- 7 July 2023
- journal article
- review article
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 127 (11-12) , 4973-4993
Abstract
No abstract availableKeywords
Funding Information
- the national key Research and Development Program of China (No. 2019YFB1704500)
- The National Natural Science Foundation of China (Grant No. 51905395, 52175360, 51805393)
- the Natural Science Foundation of Hubei Province (Grant No. 2020CFB550)
- the Young Elite Scientists Sponsorship Program by CAST (2021QNRC001)
- the National Innovation and Entrepreneurship Training Program for College Students (202210497073)
This publication has 105 references indexed in Scilit:
- Multi-objective optimization of milling parameters – the trade-offs between energy, production rate and cutting qualityJournal of Cleaner Production, 2013
- A comparison of priority rules for the job shop scheduling problem under different flow time- and tardiness-related objective functionsInternational Journal of Production Research, 2012
- A hybrid computer simulation-artificial neural network algorithm for optimisation of dispatching rule selection in stochastic job shop scheduling problemsInternational Journal of Production Research, 2012
- A new approach to scheduling in manufacturing for power consumption and carbon footprint reductionJournal of Manufacturing Systems, 2011
- Decomposition techniques for multistage scheduling problems using mixed-integer and constraint programming methodsComputers & Chemical Engineering, 2002
- Efficient dispatching rules for scheduling in a job shopInternational Journal of Production Economics, 1997
- Minimax multiobjective optimization in structural designInternational Journal for Numerical Methods in Engineering, 1990
- A dynamic priority rule for scheduling against due‐datesJournal of Operations Management, 1982
- Optimality and non-scalar-valued performance criteriaIEEE Transactions on Automatic Control, 1963
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954