Mechanism and control of progressive collapse of tied-back excavations induced by local anchor failure
- 5 July 2023
- journal article
- research article
- Published by Springer Nature in Acta Geotechnica
- Vol. 19 (2) , 763-781
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China (52178343)
- Research and Development Program of China Construction Second Engineering Bureau LTD (91110000100024296D200003)
- Research and Development Program of China State Construction Engineering Corporation LTD (CSCEC-2021-Z-25)
This publication has 16 references indexed in Scilit:
- Investigations on corrosion and mechanical properties of a 20 year old ground anchor exhumed at a power station siteCanadian Geotechnical Journal, 2016
- Failure Case Study of Tieback Wall in Urban Area, Korea2015
- Failure Mechanism of Unbonded Prestressed Thru-Anchor Cables: In Situ Investigation in Large Underground CavernsRock Mechanics and Rock Engineering, 2014
- Design considerations for one-strut failure according to TR26 – a practical approach for practising engineersThe IES Journal Part A: Civil & Structural Engineering, 2012
- Applications of Technical Reference for Deep Excavation TR26: 2010The IES Journal Part A: Civil & Structural Engineering, 2012
- Behavior of pressure-grouted anchors in gravelCanadian Geotechnical Journal, 2012
- Damage tolerance of an anchor head in a post-tensioning anchorage systemEngineering Failure Analysis, 2006
- Progressive Analysis Procedure for Progressive CollapseJournal of Performance of Constructed Facilities, 2004
- An analysis of bored pile/diaphragm wall installation effectsGéotechnique, 1994
- Foundation EngineeringSoil Science, 1953