Real-time rescheduling metaheuristic algorithms applied to FMS with routing flexibility
Authors:
- 7 March 2012
- journal article
- research article
- Published by Springer Nature in The International Journal of Advanced Manufacturing Technology
- Vol. 64 (1-4) , 145-164
Abstract
No abstract availableKeywords
This publication has 45 references indexed in Scilit:
- An effective genetic algorithm for the flexible job-shop scheduling problemExpert Systems with Applications, 2011
- Selection of alternative routings in real time: DMM and modified DMM rulesInternational Journal of Product Development, 2010
- A discrete particle swarm optimization algorithm for the no-wait flowshop scheduling problemComputers & Operations Research, 2008
- A parametric fuzzy logic approach to dynamic part routing under full routing flexibilityComputers & Industrial Engineering, 2008
- A tabu search algorithm with a new neighborhood structure for the job shop scheduling problemComputers & Operations Research, 2007
- Flexible job-shop scheduling with routing flexibility and separable setup times using ant colony optimisation methodRobotics and Computer-Integrated Manufacturing, 2007
- A review of some issues and identification of some barriers in the implementation of FMSInternational Journal of Flexible Manufacturing Systems, 2007
- Performance-based dynamic scheduling model for flexible manufacturing systemsInternational Journal of Production Research, 2006
- Ant system: optimization by a colony of cooperating agentsIEEE Transactions on Systems, Man, and Cybernetics, Part B (Cybernetics), 1996
- Optimization by Simulated AnnealingScience, 1983