Abstract
Modular construction increasingly is used for building projects to improve productivity, quality, and sustainability. However, interfaces between modules and site-based works are complex, and often cause problems that hinder the wide application of the modular approach. This paper investigated problematic interfaces in modular construction and their causes, and developed prevention strategies. The research was carried out through a 1-year participatory case study with a modular building project, coupled with an interview-based survey with leading module suppliers in the United Kimgdom. Wide-ranging problematic interfaces were identified in physical, contractual, and organizational groups from the case study, and their interconnections and complexities were examined using social network analysis. The case study results highlighted the significance of physical problematic interfaces and indicated the centrality of the module supplier in both facing and causing the problematic interfaces, which was echoed by findings from the module supplier survey. Likewise, a variety of causes were identified in the technical, contractual, and organizational aspects, markedly, the lack of management and coordination, and poor communications. Effective communication between the module supplier and installer and all other subcontractors was found to be most critical to preventing problematic interfaces, for which the module supplier should advocate and the principal contractor should coordinate. This research demonstrated the interconnections and complexities of problematic interfaces and their causes in modular construction with empirical evidence, and highlighted the leading role of module suppliers in preventing problematic interfaces. The findings contribute to a better understanding of complex problematic interfaces in modular construction and provide valuable insights into interface management of modular building projects.Keywords
This publication has 27 references indexed in Scilit:
- How to Improve Interface Management Behaviors in EPC Projects: Roles of Formal Practices and Social NormsJournal of Management in Engineering, 2018
- Exploratory Study on the Effectiveness of Interface-Management Practices in Dealing with Project Complexity in Large-Scale Engineering and Construction ProjectsJournal of Management in Engineering, 2017
- Design–construction interface problems in large building construction projectsInternational Journal of Construction Management, 2016
- Unit modular in-fill construction method for high-rise buildingsKSCE Journal of Civil Engineering, 2016
- Design in Modular Construction2014
- Future opportunities for offsite in the UKConstruction Management and Economics, 2007
- Perspectives of UK housebuilders on the use of offsite modern methods of constructionConstruction Management and Economics, 2007
- Interface Management within Construction: In Particular, Building FacadeJournal of Construction Engineering and Management, 2003
- The role of human error in construction defectsStructural Survey, 1999
- Centrality in social networks conceptual clarificationSocial Networks, 1978