Turnback Capacity Assessment and Delay Management at a Rail Transit Terminal with Two-Tail Tracks
Open Access
- 1 January 2015
- journal article
- research article
- Published by Wiley in Mathematical Problems in Engineering
- Vol. 2015, 1-12
Abstract
Terminal capacity and performance have become a major concern for rail transit agencies in China due to the ever increasing passenger demand. This paper develops a mixed integer programming (MIP) optimization model to estimate the turnback capacity and performance of a rail transit terminal with two-tail tracks. The capacity evaluation and delay propagation are described and assessed as an-track integrated model with minimal time span and train delay. Operations and design parameters such as tail track allocation strategies, maximum layover time, headway pattern, buffer time distribution scheme, and primary delay are also considered in this model. The effectiveness of the model is tested by a case study with computation results drawn from one terminal station in Shanghai, China. The case study results show that unfixed platform time and flexible tail track allocation strategies can improve the capacity of turnback operation, and the strategy of allowing swapping of the tail tracks has a significantly positive impact on delay absorption.
Keywords
Funding Information
- National Natural Science Foundation of China (61473210)
- Shanghai Shentong Metro Operations Management Center (61473210)
This publication has 17 references indexed in Scilit:
- Optimizing urban rail timetable under time-dependent demand and oversaturated conditionsTransportation Research Part C: Emerging Technologies, 2013
- A Lagrangian heuristic for a train-unit assignment problemDiscrete Applied Mathematics, 2013
- A simulation model for estimating train and passenger delays in large-scale rail transit networksJournal of Central South University, 2012
- A feasible timetable generator simulation modelling framework for train scheduling problemSimulation Modelling Practice and Theory, 2012
- Intelligent timetable evaluation using fuzzy AHPExpert Systems with Applications, 2011
- Impact of Rail Terminal Design on Transit Service ReliabilityTransportation Research Record: Journal of the Transportation Research Board, 2010
- Decision Factors in Service Control on High-Frequency Metro Line: Importance in Service DeliveryTransportation Research Record: Journal of the Transportation Research Board, 2010
- A heuristic for the train pathing and timetabling problemTransportation Research Part B: Methodological, 2009
- A Train Holding Model for Urban Rail Transit Systems2008
- Scheduling trains on a network of busy complex stationsTransportation Research Part B: Methodological, 2007