Follow-up leakage conductance surveys were made at ten-mile intervals along 335 miles of continuous asphalt mastic coated pipe. Check points included three major river crossings. Test results were compared with data reported earlier on the same pipe by D. E. Miltner (see Corrosion, 9, 210 (1953) July). It was found that the overall current requirements of the 335 miles of six-inch pipe line had not increased in 18½ years. A total current of 18 amperes overprotected the line to a minimum protective potential of 1.000 volt. Progressive deterioration of the coating as a whole was not evident although there was considerable deterioration in the immediate vicinity of coating discontinuities. The low mean average coating conductance reported indicated that cathodic protection had not adversely affected sound coatings during the 18½ year interval. 4.5.3, 5.4.10Keywords
This publication has 3 references indexed in Scilit: