Ranking of Bridge Design Alternatives: A TOPSIS-FADR Method
Open Access
- 28 September 2018
- journal article
- research article
- Published by Riga Technical University in The Baltic Journal of Road and Bridge Engineering
- Vol. 13 (3) , 209-237
Abstract
Bridges are considered as essential structures of the transport infrastructures, which play an essential role in any road network. Therefore, the process of planning and designing bridges needs to be made efficiently. The design of bridges usually consists of two stages: conceptual design and detailed design. Designers make decisions on the overall form of the structure in the conceptual design process. This process is defined as Multi-Criteria Decision-Making problems. In this study, a modified fuzzy Technique for Order of Preference by Similarity to Ideal Solution method to deal with the conceptual design process under uncertainty is proposed. The proposed method uses an area-based deviation ratio to determine the degree of difference between alternatives and reference solutions of the Technique for Order of Preference by Similarity to Ideal Solution method. Using this ratio incorporates the effects of the membership functions into the evaluation process. To illustrate the procedure of the proposed method, an example of multi-criteria assessment of bridge design including three Multi-Criteria Decision-Making problems with quantitative and qualitative criteria is used. For validation of the results of the modified fuzzy Technique for Order of Preference by Similarity to Ideal Solution method, a comparative analysis is also made. The analysis shows that the results of the proposed method are consistent with the other method.Keywords
This publication has 58 references indexed in Scilit:
- Optimal site selection of electric vehicle charging station by using fuzzy TOPSIS based on sustainability perspectiveApplied Energy, 2015
- A Dynamic Maintenance Planning Framework Based on Fuzzy TOPSIS and FMEA: Application in an International Food CompanyQuality and Reliability Engineering International, 2015
- Landfill site selection using fuzzy AHP and fuzzy TOPSIS: a case study for IstanbulEnvironmental Earth Sciences, 2014
- Selection of a Bridge Construction Site Using Fuzzy Analytical Hierarchy Process in Geographic Information SystemArabian Journal for Science and Engineering, 2014
- Construction projects selection and risk assessment by fuzzy AHP and fuzzy TOPSIS methodologiesApplied Soft Computing, 2014
- CAD/CAM System Selection: A Multi-Component Hybrid Fuzzy MCDM ModelArabian Journal for Science and Engineering, 2013
- Fuzzy Group Decision Making for the Selection of Facility LocationGroup Decision and Negotiation, 2010
- Decision Support System for Bridge Network Maintenance Planning2007
- An approach to multicriteria fuzzy optimization of a prestressed concrete bridge system considering cost and aesthetic feelingStructural and Multidisciplinary Optimization, 1998
- Fuzzy Multiple Attribute Decision Making Methods1992