Dynamic optimisation of preventative and corrective maintenance schedules for a large scale urban drainage system
Authors:
- Yujie ChenYCYujie Chen
- Peter CowlingPCPeter Cowling
- Fiona PolackFPFiona Polack
- Stephen RemdeSRStephen Remde
- Philip MourdjisPMPhilip Mourdjis
- 1 March 2017
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 257 (2) , 494-510
Abstract
No abstract availableKeywords
Funding Information
- Engineering and Physical Sciences Research Council (EP/F501374/1)
This publication has 44 references indexed in Scilit:
- A metaheuristic for a teaching assistant assignment-routing problemComputers & Operations Research, 2012
- The period vehicle routing problem: New heuristics and real-world variantsTransportation Research Part E: Logistics and Transportation Review, 2011
- Variable neighbourhood search: methods and applicationsAnnals of Operations Research, 2009
- Simultaneous control of production, preventive and corrective maintenance rates of a failure-prone manufacturing systemApplied Numerical Mathematics, 2008
- Scheduling technicians for planned maintenance of geographically distributed equipmentTransportation Research Part E: Logistics and Transportation Review, 2007
- Minimizing Labor Requirements in a Periodic Vehicle Loading ProblemComputational Optimization and Applications, 2005
- Integrated ecological, economic and social impact assessment of alternative flood control policies in the NetherlandsEcological Economics, 2004
- A generic conceptual simulation model for maintenance systemsJournal of Quality in Maintenance Engineering, 2001
- Condition‐based maintenance: tools and decision makingJournal of Quality in Maintenance Engineering, 1995
- An improved heuristic for the period vehicle routing problemNetworks, 1995