Multi-Terminal Berth and Quay Crane Joint Scheduling in Container Ports Considering Carbon Cost
Open Access
- 12 March 2023
- journal article
- research article
- Published by MDPI AG in Sustainability
- Vol. 15 (6) , 5018
Abstract
As container ports become increasingly important to the global supply chain, a growing number of ports are improving their competencies by consolidating multiple terminal resources internally. In addition, in the context of energy conservation and emission reduction, ports measure competitiveness not only in terms of terminal size, throughput and service level, but also in terms of low energy consumption and low pollution. Therefore, a nonlinear mixed-integer programming model considering the cost of carbon is developed for the multi-terminal berth and quay crane joint robust scheduling problem under uncertain environments to minimize the sum of expectation and variance of total cost under all randomly generated samples. The model considers the water depth and interference of quay cranes, etc. The expected vessel arrival time and the average operational efficiency plus relaxation are used as their actual values when scheduling. Finally, an improved adaptive genetic algorithm is developed by combining the simulated annealing mechanism, and numerical experiments are designed. The results show that the joint berth and quay crane scheduling with uncertainties and a multi-terminal coordination mechanism can effectively reduce the operating cost, including carbon costs and the vessel departure delay rate, and can improve resource utilization. Meanwhile, the scheduling with the multi-terminal coordination mechanism can obtain more significant improvement effects than the scheduling with uncertainties.Keywords
Funding Information
- National Natural Science Foundation of China (51605442, LGN18G010002)
- Natural Science Foundation of Zhejiang Province (51605442, LGN18G010002)
This publication has 34 references indexed in Scilit:
- MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problemEuropean Journal of Operational Research, 2018
- The continuous Berth Allocation Problem in a container terminal with multiple quaysExpert Systems with Applications, 2015
- A follow-up survey of berth allocation and quay crane scheduling problems in container terminalsEuropean Journal of Operational Research, 2015
- A bi-objective model for robust berth allocation schedulingComputers & Industrial Engineering, 2012
- A proactive approach for simultaneous berth and quay crane scheduling problem with stochastic arrival and handling timeEuropean Journal of Operational Research, 2010
- Integrated quay crane and yard truck schedule problem in container terminalsTsinghua Science and Technology, 2010
- A survey of berth allocation and quay crane scheduling problems in container terminalsEuropean Journal of Operational Research, 2010
- An integrated storage space and berth allocation problem in a container terminalInternational Journal of Mathematics in Operational Research, 2010
- Berthing ships at a multi-user container terminal with a limited quay capacityTransportation Research Part E: Logistics and Transportation Review, 2008
- A genetic algorithm for the set covering problemEuropean Journal of Operational Research, 1996