Submerged Wall Instead of a Penstock Shutoff Valve—Alternative Protection as Part of a Refurbishment
Open Access
Abstract
Hydropower is an important source of renewable energy. Due to ageing infrastructure, more and more existing hydropower plants have to be refurbished and modernised. This includes a complete review of the design parameters as well as the change of specific parts. Investments should be targeted to improve the overall performance of hydropower plants and ensure a long lasting life extension. This paper presents the concept of the submerged wall as a local high point in the headrace tunnel, which can—in combination with the intake gates—replace existing penstock shutoff valves. Such a replacement was conducted for the hydropower plant Schneiderau in Austria, which also allowed us to prove the concept based on measurements including a simulated break of the penstock. The presented solution can help to reduce investment costs and also minimise maintenance efforts and therefore is an attractive option for classic penstock shutoff valves for comparable projects.Keywords
Funding Information
- Austrian Science Fund (J3918)
This publication has 56 references indexed in Scilit:
- Penstock failure detection system at the "Valsan" hydro power plantIOP Conference Series: Earth and Environmental Science, 2012
- Three-Dimensional Numerical Modeling of Cavitation and Aeration System in Dam OutletsJournal of Fluids Engineering, 2012
- Accuracy of the ultrasonic flow meter used in the hydroturbine intake penstock of the Three Gorges Power StationFlow Measurement and Instrumentation, 2012
- The Reißeck II pumped storage power station in Carinthia / Das Pumpspeicherkraftwerk (PSKW) Reißeck II in KärntenGeomechanics and Tunnelling, 2011
- The Reißeck II pumped storage power station / Das Pumpspeicherkraftwerk (PSKW) Reißeck IIGeomechanics and Tunnelling, 2011
- Power station construction then and now through the example of the Glockner/Kaprun power station group and the PSW Limberg II in KaprunGeomechanics and Tunnelling, 2009
- Lessons Learned: Failure of a Hydroelectric Power Project DamJournal of Performance of Constructed Facilities, 2005
- A Review of Water Hammer Theory and PracticeApplied Mechanics Reviews, 2005
- Air demand behind high head gates during emergency closureJournal of Hydraulic Research, 2002
- Case Study: Lapino Powerplant Penstock FailureJournal of Hydraulic Engineering, 2001