A Graph-based Genetic Algorithm to Solve the Virtual Constellation Multi-Satellite Collection Scheduling Problem
Authors:
- 1 July 2018
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-10
Abstract
A variety of near-optimal problem-solving methods inspired from operations research and computational intelligence has been proposed to solve the NP-hard multi-satellite collection scheduling problem (m-SatCSP). In particular, genetic algorithms, well-suited for large-scale problems due to their simplicity and low-cost implementation have been the most pervasive and proven to be very effective. However, most reported contributions mainly promote basic permutation-based genetic principles with limited variants, overlooking prior problem structure exploitation and, widely focus on a single satellite or simple trailing satellites constellation composition. In this paper, a novel graph-based hybrid genetic algorithm is introduced to tackle the static m-SatCSP, involving a mixture of any non-trailing satellites composing a virtual constellation. The proposed Genetic Algorithm-based collecTion scHedulER (GATHER) explicitly exploits problem structure governing feasible imaging opportunity transitions through collection graphs to better handle temporal constraints. Coupled to a low-cost task scheduling heuristic integrated to genetic operators it enhances directed search and speed-up the generation of feasible high-quality solutions. The scheduling approach introduces the notion of mutual satellite orbit compatibility for dissimilar platforms to efficiently explore promising regions of the search space in evolving collection path plans. Taking advantage of those problem domain knowledge instances, the hybrid strategy evolves a mixed population of feasible/infeasible individuals to maximize the expected collection value. A multi-objective implementation named MO-GATHER is finally proposed. Computational experiments confirm that GATHER is cost-effective and competitive in comparison to alternate baseline scheduling heuristics. The benefits of MO-GATHER to decision makers are also discussed.Keywords
This publication has 14 references indexed in Scilit:
- An Evolutionary Many-Objective Optimization Algorithm Using Reference-Point-Based Nondominated Sorting Approach, Part I: Solving Problems With Box ConstraintsIEEE Transactions on Evolutionary Computation, 2013
- A two-phase scheduling method with the consideration of task clustering for earth observing satellitesComputers & Operations Research, 2013
- Multi-objective Optimization for Selecting and Scheduling Observations by Agile Earth Observing Satellites2012
- Development of a scheduling algorithm and GUI for autonomous satellite missionsActa Astronautica, 2011
- A genetic algorithm approach for solving the daily photograph selection problem of the SPOT5 satelliteComputers & Industrial Engineering, 2010
- Scheduling Space–Ground Communications for the Air Force Satellite Control NetworkJournal of Scheduling, 2004
- Selecting and scheduling observations of agile satellitesAerospace Science and Technology, 2002
- A fast and elitist multiobjective genetic algorithm: NSGA-IIIEEE Transactions on Evolutionary Computation, 2002
- Three Scheduling Algorithms Applied to the Earth Observing Systems DomainManagement Science, 2000
- The Vehicle Routing Problem with Time Windows Part II: Genetic SearchINFORMS Journal on Computing, 1996