An Ant Algorithm Hyperheuristic for the Project Presentation Scheduling Problem
Authors:
- E. BurkeEBE. Burke
- G. KendallGKG. Kendall
- D.L. SilvaDSD.L. Silva
- R. O'BRienROR. O'BRien
- E. SoubeigaESE. Soubeiga
- 13 December 2005
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- Vol. 3, 2263-2270
Abstract
Ant algorithms have generated significant re- search interest within the search/optimisation commu- nity in recent years. Hyperheuristic research is con- cerned with the development of "heuristics to choose heuristics" in an attempt to raise the level of general- ity at which optimisation systems can operate. In this paper the two are brought together. An investigation of the ant algorithm as a hyperheuristic is presented and discussed. The results are evaluated against other hyper- heuristic methods, when applied to a real world schedul- ing problem.Keywords
This publication has 10 references indexed in Scilit:
- Case-based heuristic selection for timetabling problemsJournal of Scheduling, 2006
- Hyper-Heuristics: An Emerging Direction in Modern Search Technology2006
- Multi-Objective Hyper-Heuristic Approaches for Space Allocation and Timetabling2005
- Hybrid Graph Heuristics within a Hyper-Heuristic Approach to Exam Timetabling Problems2005
- A Tabu-Search Hyperheuristic for Timetabling and RosteringJournal of Heuristics, 2003
- An investigation of a hyperheuristic genetic algorithm applied to a trainer scheduling problem2003
- Guided Operators for a Hyper-Heuristic Genetic Algorithm2003
- Applying Ant Algorithms and the No Fit Polygon to the Nesting Problem1999
- Ants can colour graphsJournal of the Operational Research Society, 1997
- Ant system: optimization by a colony of cooperating agentsIEEE Transactions on Systems, Man, and Cybernetics, Part B (Cybernetics), 1996