Change Point Estimates for the Parameters of an AR(1) Process
Authors:
- Douglas H. TimmerDTDouglas H. Timmer
- Joseph J. PignatielloJPJoseph J. Pignatiello
- 1 July 2003
- journal article
- research article
- Published by Wiley in Quality and Reliability Engineering International
- Vol. 19 (4) , 355-369
Abstract
Three change point estimates for the parameters of a first‐order autoregressive (AR(1)) model are developed. The estimators are applied once a control chart signals indicating the presence of a special or assignable cause of variability. The knowledge of the change point can greatly aid the quality practitioner in identifying and removing special causes of variability. Techniques for determining the change point for the location of the AR(1) process, the variance of the white noise process and the autoregressive parameter changed are presented. Simulation results are provided to evaluate the effectiveness of the three change point estimators. Copyright © 2003 John Wiley & Sons, Ltd.Keywords
This publication has 6 references indexed in Scilit:
- The development and evaluation of CUSUM-based control charts for an AR(1) processIIE Transactions, 1998
- IDENTIFYING THE TIME OF A STEP CHANGE WITH X¯ CONTROL CHARTSQuality Engineering, 1998
- IDENTIFYING THE TIME OF A STEP CHANGE IN A NORMAL PROCESS VARIANCEQuality Engineering, 1998
- Performance of CUSUM Control Schemes for Serially Correlated ObservationsTechnometrics, 1993
- A comparison of control charts from the viewpoint of change‐point estimationQuality and Reliability Engineering International, 1992
- Time-Series Modeling for Statistical Process ControlJournal of Business & Economic Statistics, 1988