Channel morphologic processes of a highly sinuous bend approaching neck cutoff by bank erosion in the middle Yangtze River
Authors:
- Zhiwei LiZhiwei Li
- Hanyuan YangHYHanyuan Yang
- Junqiang XiaJXJunqiang Xia
- Meirong ZhouMZMeirong Zhou
- Shanshan DengSDShanshan Deng
- Yingzhen WangYWYingzhen Wang
- 1 August 2021
- journal article
- research article
- Published by Elsevier in International Journal of Sediment Research
- Vol. 36 (4) , 457-467
Abstract
No abstract availableKeywords
Funding Information
- National Natural Science Foundation of China
This publication has 50 references indexed in Scilit:
- Impacts of large dams on downstream fluvial sedimentation: An example of the Three Gorges Dam (TGD) on the Changjiang (Yangtze River)Journal of Hydrology, 2013
- Assessing the potential for change in the middle Yangtze River channel following impoundment of the Three Gorges DamGeomorphology, 2012
- Extreme sediment pulses generated by bend cutoffs along a large meandering riverNature Geoscience, 2011
- Seasonal variations of sediment discharge from the Yangtze River before and after impoundment of the Three Gorges DamGeomorphology, 2009
- Planform dynamics of the Lower Mississippi RiverEarth Surface Processes and Landforms, 2006
- Dams and geomorphology: Research progress and future directionsGeomorphology, 2005
- Quantifying the mechanical and hydrologic effects of riparian vegetation on streambank stabilityEarth Surface Processes and Landforms, 2002
- Bank and near-bank processes in an incised channelGeomorphology, 2000
- Channel and floodplain response to recent abrupt climate change: The tyne basin, Northern EnglandEarth Surface Processes and Landforms, 1994
- A genetic classification of floodplainsGeomorphology, 1992