A new bounding mechanism for the CNC machine scheduling problems with controllable processing times
Authors:
- Rabia K. KayanRKRabia K. Kayan
- M. Selim AkturkMAM. Selim Akturk
- 1 December 2005
- journal article
- Published by Elsevier in European Journal of Operational Research
- Vol. 167 (3) , 624-643
Abstract
No abstract availableKeywords
This publication has 12 references indexed in Scilit:
- Joint lot sizing and tool management in a CNC environmentComputers in Industry, 1999
- Flow-line scheduling problem with controllable processing timesIIE Transactions, 1997
- Tool allocation and machining conditions optimization for CNC machinesEuropean Journal of Operational Research, 1996
- Scheduling Parallel Manufacturing Cells with Resource FlexibilityManagement Science, 1996
- Parallel-machine scheduling with controllable processing timesIIE Transactions, 1996
- A bicriterion approach to preemptive scheduling of parallel machines with controllable job processing timesDiscrete Applied Mathematics, 1995
- Scheduling Multiple Variable-Speed MachinesOperations Research, 1994
- Single-machine sequencing with controllable processing timesEuropean Journal of Operational Research, 1992
- A survey of results for sequencing problems with controllable processing timesDiscrete Applied Mathematics, 1990
- An Interactive Multiple Criteria Approach for Parameter Selection in Metal CuttingOperations Research, 1989