Abstract
The runoff response of a small drainage basin in southern Ontario has been monitored over a 5 year period, during which 25 per cent of its surface has been modified by suburban construction activity. Direct runoff response to summer and autumn rainstorms has not been noticeably affected by the development, but response to spring snowmelt has increased by three to four times. Summer and autumn storm runoff still appears to be generated mainly by direct precipitation on a natural, saturated, contributing zone alongside the channel, which has been little affected by the construction activity. The construction surfaces have had their infiltration capacities greatly reduced by devegetation and compaction, but runoff from them does not contribute to the storm hydrograph unless ephemeral channels and swales which link them to the main stream are saturated and capable of conducting flow. This happens rarely during rainstorms, but consistently during snowmelt, when ground conditions are extremely wet. The seasonal contrasts in the effect of partial suburban development on direct runoff response, are therefore caused by seasonal variations in the extent to which the construction surfaces are integrated into the active runoff contributing zone of the drainage basin.

This publication has 9 references indexed in Scilit: