A mathematical model on EPQ for stochastic demand in an imperfect production system
Authors:
- Brojeswar PalBPBrojeswar Pal
- Shib Sankar SanaSSShib Sankar Sana
- Kripasindhu ChaudhuriKCKripasindhu Chaudhuri
- 1 January 2013
- journal article
- research article
- Published by Elsevier in Journal of Manufacturing Systems
- Vol. 32 (1) , 260-270
Abstract
No abstract availableKeywords
This publication has 31 references indexed in Scilit:
- An improved solution to replenishment lot size problem with discontinuous issuing policy and rework, and the multi-delivery policy into economic production lot size problem with partial reworkExpert Systems with Applications, 2012
- A complement to “A comprehensive note on: An economic order quantity with imperfect quality and quantity discounts”Applied Mathematical Modelling, 2012
- Economic production quantity with rework process at a single-stage manufacturing system with planned backordersComputers & Industrial Engineering, 2009
- On optimal batch sizing in a multi-stage production system with rework considerationEuropean Journal of Operational Research, 2009
- Optimal manufacturing batch size with rework in a single-stage production system – A simple derivationComputers & Industrial Engineering, 2008
- On optimal manufacturing batch size with rework process at single-stage production systemComputers & Industrial Engineering, 2007
- Optimal production run length for products sold with warranty in an imperfect production system with allowable shortagesMathematical and Computer Modelling, 2006
- An optimal production run time with imperfect production processes and allowable shortagesComputers & Operations Research, 2003
- The economic production quantity (EPQ) with shortage derived algebraicallyInternational Journal of Production Economics, 2001
- An improved decomposition method for the analysis of production lines with unreliable machines and finite buffersInternational Journal of Production Research, 1999