Cost estimation model of prefabricated construction for general contractors based on system dynamics
- 8 August 2023
- journal article
- research article
- Published by Emerald Publishing in Engineering, Construction and Architectural Management
- Vol. 32 (1) , 621-638
Abstract
Purpose: The poor capacity of prefabricated construction cost estimation is the essential reason for the low profitability of the general contractor. Therefore, this study aims to focus on the cost estimation of prefabricated construction as the research object. This research aims to enhance the accuracy of total project cost estimation for general contractors, ultimately leading to improved profitability.Design/methodology/approach: This study used Vensim PLE software to establish a system dynamics model. In the modeling process, a systematic research review was used to identify cost-influencing factors; ABC classification and the analytic hierarchy process were used to score and determine the weights of influencing factors.Findings: The total cost error obtained by the model is less than 2% compared with the actual value. It can be used to cost estimation and analysis. The analysis results indicate that there are 7 key factors, among which the prefabrication rate has the most significant impact. Furthermore, the model can provide the extreme range cost; the minimum cost can reduce by 13% from the value in the case. The factor's value can compose a cost control strategy for general contractors.Practical implications: The cost of prefabricated buildings can be estimated well, and deciding the prefabrication rate is crucial. The cost can be declined by correct cost control strategies when bidding and subcontracting are in process. The strategies can follow the direction of the model.Originality/value: A systemic, quantitative and qualitative analysis of cost estimation of prefabricated buildings for general contractors has been conducted. A mathematical model has been developed and validated to facilitate more effective cost-control measures.Keywords
This publication has 41 references indexed in Scilit:
- Effect of stakeholder collaborative management on off-site construction cost performanceJournal of Cleaner Production, 2018
- Barriers to promoting prefabricated construction in China: A cost–benefit analysisJournal of Cleaner Production, 2018
- BIM-Based Collaboration Platform for the Management of EPC Projects in Hydropower EngineeringJournal of Construction Engineering and Management, 2017
- Factors Affecting the Capital Cost of Prefabrication—A Case Study of ChinaSustainability, 2017
- What Is the State of theArt of Systematic Reviewin Engineering Education?Journal of Engineering Education, 2015
- Supply chain resilience: role of complexities and strategiesInternational Journal of Production Research, 2014
- DEVELOPING BIM-ASSISTED AS-BUILT SCHEDULE MANAGEMENT SYSTEM FOR GENERAL CONTRACTORSJOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2014
- WEB-BASED CONTRACTOR EVALUATION SYSTEM FOR MASS-HOUSING PROJECTS IN TURKEYJOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2012
- Transaction-Cost-Based Selection of Appropriate General Contractor-Subcontractor Relationship TypeJournal of Construction Engineering and Management, 2009
- Web-Enabled System Dynamics Model for Error and Change Management on Concurrent Design and Construction ProjectsJournal of Computing in Civil Engineering, 2006