Optimizing Labor Allocation in Modular Construction Factory Using Discrete Event Simulation and Genetic Algorithm
Authors:
- 14 December 2020
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 2569-2576
Abstract
Modular construction is gaining popularity in the USA due to several advantages over stick-built methods in terms of reduced waste and faster production. Since modular construction factories operate as an assembly line, the number of workers at various workstations dictates the efficiency of the overall production. This paper presents a resource allocation framework combining discrete event simulation (DES) model and genetic algorithm (GA) to facilitate data-driven decision making. The DES model simulates the process of building modular units in the factory, and the GA optimizes the number of the worker at different workstations yielding to minimum makespan. A case study with a real-world modular construction factory showed that optimizing the assignment of available workers can reduce the makespan by up to 15%. This study demonstrates the potential of the proposed method as a practical tool to optimize resource allocation in the uncertain work environments in modular construction factories.Keywords
This publication has 16 references indexed in Scilit:
- Integration of genetic algorithm, analytic hierarchy process and computer simulation for optimisation of operator allocation in manufacturing systems with weighted variablesInternational Journal of Logistics Systems and Management, 2014
- Knowledge-Based Simulation Modeling of Construction Fleet Operations Using Multimodal-Process Data MiningJournal of Construction Engineering and Management, 2013
- The Resource Leveling Problem with multiple resources using an adaptive genetic algorithmAutomation in Construction, 2013
- Application of Modular Construction in High-Rise BuildingsJournal of Architectural Engineering, 2012
- Internal relationship modeling and production planning optimization for the manufactured housingAutomation in Construction, 2011
- Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraintsAutomation in Construction, 2009
- A generalised framework for simulation-based decision support for manufacturingProduction Planning & Control, 2008
- Concessionaire Selection: Methods and CriteriaJournal of Construction Engineering and Management, 2004
- Re-engineering through pre-assembly: client expectations and driversBuilding Research & Information, 2003
- Resource leveling in construction by genetic algorithm-based optimization and its decision support system applicationAutomation in Construction, 2000