Lifting Sequence Optimization of Luffing Tower Cranes Considering Motion Paths with Dynamic Programming
Open Access
- 1 October 2021
- journal article
- research article
- Published by American Society of Civil Engineers (ASCE) in Journal of Construction Engineering and Management
- Vol. 147 (10) , 04021126
Abstract
The lifting sequence of luffing tower cranes is a key factor in the normal operation of construction projects. Accurate estimation of total lifting time is necessary for lifting sequence optimization. Existing formulations for lifting time estimation have two main deficiencies. One is that the relationship between the hoist motion path of the hook and the luffing motion path of the boom is often neglected. The other is that lifting delays resulting from the horizontal motion path of the boom caused by the relative locations of the crane and the lifting start and end points are rarely taken into account. To address those limitations, this paper proposes a lifting sequence optimization model (LSOM) considering motion paths with dynamic programming. The effectiveness of the proposed model is evaluated by comparing it with three conventional lifting strategies [first in–first serve (FIFS), shortest job first (SJF), and nearest neighbor first (NNF)]. The results show that LSOM achieves a shorter total lifting time and higher crane utilization when compared with FIFS, SJF, and NNF.Keywords
This publication has 35 references indexed in Scilit:
- Research on Anti-Backward-Tipping Device of Luffing Jib Tower CraneApplied Mechanics and Materials, 2012
- Ultra-wide band technology experiments for real-time prevention of tower crane collisionsAutomation in Construction, 2012
- A dynamic programming approach for batch sizing in a multi-stage production process with random yieldsApplied Mathematics and Computation, 2011
- Optimization of tower crane and material supply locations in a high-rise building site by mixed-integer linear programmingAutomation in Construction, 2011
- A graphical realization of the dynamic programming method for solving -hard combinatorial problemsComputers & Mathematics with Applications, 2009
- GA-ANN model for optimizing the locations of tower crane and supply points for high-rise public housing constructionConstruction Management and Economics, 2003
- Nonlinear Models for Predicting Hoisting Times of Tower CranesJournal of Computing in Civil Engineering, 2002
- Comparative study of artificial neural networks and multiple regression analysis for predicting hoisting times of tower cranesBuilding and Environment, 2001
- Prediction of hoisting time for tower cranes for public housing construction in Hong KongConstruction Management and Economics, 1999
- A computer‐based model for optimizing the location of a single tower craneBuilding Research & Information, 1996