Optimisation Of Pressure Sewer Operation
Authors:
Preprint
Abstract
The paper deals with the new control method developed for the pressure sewer systems. This method eliminates the disadvantages of currently common used on-off regulation. The major disadvantage is a transition of inconstancies of the effluent production into the sewage system. The propose method is primarily based on the principle of an allocation of the drawing off into the given time slots. This control method is further improved by the extended modules provide higher level of the optimization (learning mode and emergent drawing off). Proposed method is able to decrease of the standard deviation of pumping even by 80%.Keywords
All Related Versions
This publication has 3 references indexed in Scilit:
- The time slot allocation problem under uncertain capacityTransportation Research Part C: Emerging Technologies, 2014
- Mechanized Extraction of Topology Anti-patterns in Wireless NetworksLecture Notes in Computer Science, 2012
- Qualitative modeling and monitoring of selected ecosystem functionsEcological Modelling, 2011