Two-stage hybrid batching flowshop scheduling with blocking and machine availability constraints using genetic algorithm
Authors:
- 31 December 2009
- journal article
- Published by Elsevier in Robotics and Computer-Integrated Manufacturing
- Vol. 25 (6) , 962-971
Abstract
No abstract availableKeywords
This publication has 20 references indexed in Scilit:
- Scheduling a hybrid flowshop with batch production at the last stageComputers & Operations Research, 2007
- A branch-and-bound algorithm for a two-stage hybrid flowshop scheduling problem minimizing total tardinessInternational Journal of Production Research, 2004
- Genetic algorithm based scheduling of parallel batch machines with incompatible job families to minimize total weighted tardinessInternational Journal of Production Research, 2004
- Two-machine flow shops with limited machine availabilityEuropean Journal of Operational Research, 2002
- Scheduling with batching: A reviewEuropean Journal of Operational Research, 2000
- Two-machine flowshop scheduling with consecutive availability constraintsInformation Processing Letters, 1999
- Scheduling a batching machineJournal of Scheduling, 1998
- Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraintOperations Research Letters, 1997
- Batching and Scheduling Jobs on Batch and Discrete ProcessorsOperations Research, 1992
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954