Walk cycle design for flexible manpower lines using genetic algorithms
Authors:
- 1 January 2005
- journal article
- research article
- Published by Taylor & Francis in International Journal of Computer Integrated Manufacturing
- Vol. 18 (1) , 15-26
Abstract
To achieve lean and responsive manufacturing, waiting and downtime between process steps must be removed. The flexible manpower line achieves these aims by enabling 'one piece flow' to be established. Flexible manpower lines are essentially flow process lines in which operators are allocated 'walk cycles', i.e. a repetitive sequence in which to load and unload machine tools. Effective design of operator 'walk cycles' enables manpower needs to be minimized, by allowing spare labour to move between production areas. Traditional methods of designing flow process lines are either heuristic in nature or generate random solutions using a computer. When these are used to design flexible manpower lines there are significant limitations since they cannot take into consideration the design of operator 'walk cycles' which are essential if labour utilisation is to be maximised. Current methods of designing flexible manpower lines are essentially manually based and require both past experience and many design iterations before acceptable line designs can be identified. This paper describes a design methodology for flexible manpower lines that involves the use of genetic algorithms (GAs).Keywords
This publication has 3 references indexed in Scilit:
- A multi-objective genetic local search algorithm and its application to flowshop schedulingIEEE Transactions on Systems, Man and Cybernetics, Part C (Applications and Reviews), 1998
- Genetic algorithms for the two-stage bicriteria flowshop problemEuropean Journal of Operational Research, 1996
- Co-evolving parasites improve simulated evolution as an optimization procedurePhysica D: Nonlinear Phenomena, 1990