Hybrid SWARA-COPRAS method for risk assessment in deep foundation excavation project: an iranian case study
Top Cited Papers
Open Access
- 21 April 2017
- journal article
- Published by Vilnius Gediminas Technical University in JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT
- Vol. 23 (4) , 524-532
Abstract
Existing risks in deep foundation excavation projects is a major issue in developing cities. With the rapid in-crease in the number of various deep foundation and excavation projects in big cities of Iran, many accidents related to deep excavation have been reported every year. These accidents affected delay and increased cost of project implemen-tation. Therefore identification and assessment of risks of these accidents is essential. The aim of the research was to develop a framework to overcome limitations of previous approaches to assess of risks in excavation projects. According to the complexity of a problem and the inherent uncertainty, the framework adopted SWARA (Step-wise Weight As-sessment Ratio Analysis) and COPRAS (COmplex PRoportional ASsessment) methods through introducing new criteria for risk assessment. Data was collected through interview, a literature review and a questionnaire survey distributed to excavation project experts. A case study of deep foundation excavation in Shiraz was presented. The results have shown that the risks involving construction safety, unfavourable geological conditions, shortage of managerial experience, in-complete emergency plan and subsidence of ground are the most significant risks excavation projects in Shiraz. The proposed framework and the obtained results can help stakeholders of excavation projects in developing countries better to manage project risks.Keywords
This publication has 22 references indexed in Scilit:
- Risk assessment and risk management: Review of recent advances on their foundationEuropean Journal of Operational Research, 2016
- INTERNAL AND EXTERNAL RISK BASED ASSESMENT AND EVALUATION FOR THE LARGE INFRASTRUCTURE PROJECTSJOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2016
- Subway Risks Assessment in Different Construction Stages using AHP and TOPSISIndian Journal of Science and Technology, 2016
- Solving Civil Engineering Problems by Means of Fuzzy and Stochastic MCDM Methods: Current State and Future ResearchMathematical Problems in Engineering, 2015
- Implications of black swans to the foundations and practice of risk assessment and managementReliability Engineering & System Safety, 2015
- RISK MANAGEMENT IN CONSTRUCTION PROJECTSTechnological and Economic Development of Economy, 2015
- Research on the Risk of Deep Foundation Excavation Engineering Management Based on RBS and AHPApplied Mechanics and Materials, 2013
- Contractors' perception of the use of costs of quality system in Malaysian building construction projectsInternational Journal of Project Management, 2012
- INTEGRATED FUZZY MULTIPLE CRITERIA DECISION MAKING MODEL FOR ARCHITECT SELECTION / INTEGRUOTAS NERAIŠKUSIS DAUGIATIKSLIS SPRENDIMŲ PRIĖMIMO MODELIS ARCHITEKTUI ATRINKTITechnological and Economic Development of Economy, 2012
- SELECTION OF RATIONAL DISPUTE RESOLUTION METHOD BY APPLYING NEW STEP‐WISE WEIGHT ASSESSMENT RATIO ANALYSIS (SWARA)Journal of Business Economics and Management, 2010