OVERHEAD COSTS AND PROFIT CALCULATION BY POLISH CONTRACTORS
Open Access
- 2 April 2013
- journal article
- Published by Vilnius Gediminas Technical University in Technological and Economic Development of Economy
- Vol. 19 (1) , 141-161
Abstract
The main criterion taken into consideration when choosing a contractor is the bid price that the contractor suggests. The basis for determining such a price are the direct costs connected with works realization as well as mark-ups, mainly overhead costs and profit. Overhead costs and profit constitute a considerable part of the bid price and their improper calculation can significantly influence the financial situation of the company. In literature and in practice one can find many definitions and ways of determining overhead costs and profit. The article presents research results concerning defining and calculating overhead costs and profit by Polish contractors, carried out twice – in 2004 and 2010. They were compared with similar studies performed in other countries. The article also presents mathematical methods created by the authors, by means of which overhead costs and profit can be calculated more precisely than by the popular methods commonly employed by Polish contractors.Keywords
This publication has 32 references indexed in Scilit:
- NEW CLASSIFICATION OF CONSTRUCTION COMPANIES: OVERHEAD COSTS ASPECT / NAUJAS STATYBOS ĮMONI ŲKLASIFIKAVIMAS: PRIDĖTINIŲ IŠLAIDŲ ASPEKTASJOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2011
- MULTI‐OBJECTIVE CONTRACTOR'S RANKING BY APPLYING THE MOORA METHODJournal of Business Economics and Management, 2008
- SCBMD: A knowledge-based system software for strategically correct bid/no bid and mark-up size decisionsAutomation in Construction, 2008
- A case-based decision support tool for bid mark-up estimation of international construction projectsAutomation in Construction, 2007
- Classifying Construction Contractors Using Unsupervised-Learning Neural NetworksJournal of Construction Engineering and Management, 2006
- Effect of Common Cause Failures on Indirect CostsJournal of Bridge Engineering, 2004
- The factors influencing bid mark-up decisions of large- and medium-size contractors in SingaporeConstruction Management and Economics, 2002
- The management of construction company overhead costsInternational Journal of Project Management, 2001
- Case-Based Reasoning Approach in Bid Decision MakingJournal of Construction Engineering and Management, 2001
- Key Factors in Bid Reasoning ModelJournal of Construction Engineering and Management, 2000