A hybrid approach of wind farm site selection using Group Best‐Worst Method and GIS‐Based Fuzzy Logic Relations. A case study in Vietnam
- 12 January 2022
- journal article
- research article
- Published by Wiley in Environmental Quality Management
- Vol. 32 (2) , 251-267
Abstract
In this study, a hybrid model was developed by the combination of Group Multi‐Criteria Decision‐Making Based on Best‐Worst Method (so‐called Group Best Worst Method) and GIS‐Based Fuzzy Logic Relations to provide decision support of the sustainable development of wind power. The proposed model was developed in four main steps including 1) defining exclusion criteria and weighted criteria; 2) normalizing data by fuzzy membership functions in GIS environment; 3) determining the influence/weighting of the criteria through Group Best‐Worst Method; and 4) identifying the suitable areas for wind farm location. In a case study of Bac Lieu Province, Vietnam, it resulted in the coastal areas being most suitable for the development of wind power. It was found to be in line with the local plan of renewable energy development. Moreover, the paddy field areas could also be highly suitable for wind energy sitting due to the reduced adverse effects on nature reserves biodiversity, and the potential benefits associated with the increased land values and local farmer's income, higher crop yield, etc. The proposed hybrid model is considered a novel and straightforward approach in wind power planning that can be extended to other fields of MCDM regarding the selection of geographical location for the other renewable energy projects.Keywords
This publication has 46 references indexed in Scilit:
- Best-worst multi-criteria decision-making methodOmega, 2015
- Impact analysis of wind farms on telecommunication servicesRenewable and Sustainable Energy Reviews, 2014
- Wind distribution and capacity factor estimation for wind turbines in the coastal region of South AfricaEnergy Conversion and Management, 2012
- Methodologies Used in the Extrapolation of Wind Speed Data at Different Heights and Its Impact in the Wind Energy Resource Assessment in a Region2011
- MCDM Developments in the 1970s2011
- Environmental management framework for wind farm siting: Methodology and case studyJournal of Environmental Management, 2010
- Wind energy projects in New York: Facing the siting issueEnvironmental Quality Management, 2005
- Instantaneous wind energy penetration in isolated electricity grids: concepts and reviewRenewable Energy, 2005
- FUZZY SETS1996
- What is the Analytic Hierarchy Process?1988