Collection line optimisation in wind farms using improved ant colony optimisation
Authors:
- 15 May 2020
- journal article
- research article
- Published by SAGE Publications in Wind Engineering
- Vol. 45 (3) , 589-600
Abstract
Collection line optimisation plays an important role in reducing the wind farm construction cost and improving the reliability of collector system. First, the optimisation model of collection lines in wind farms is given. Based on the four-vertex-three-line inequality and Prim algorithm, an improved ant colony optimisation algorithm is introduced to minimise the total length of collection lines to reduce their cost. In addition, the K-means clustering algorithm is adopted to partition the total wind turbines into several groups for the improved ant colony optimisation algorithm to search the shortest collection lines. The improved ant colony optimisation algorithm is tested with a wind farm example and compared with the classic ant colony optimisation algorithm. Under the same preconditions, the experimental results show that compared to the classic ant colony optimisation algorithm, the improved ant colony optimisation algorithm finds shorter collection lines in radial configuration for the wind farm. In addition, the improved ant colony optimisation algorithm requires less computation cycles to find better collection lines.Keywords
Funding Information
- National Natural Science Foundation of China (51205129)
- Fundamental Research Funds for the Central Universities (No.2018MS039 and No.2018ZD09)
This publication has 15 references indexed in Scilit:
- Optimizing wind farm cable routing considering power lossesEuropean Journal of Operational Research, 2018
- Simulated annealing based symbiotic organisms search optimization algorithm for traveling salesman problemExpert Systems with Applications, 2017
- Ant colony optimization with clustering for solving the dynamic location routing problemApplied Mathematics and Computation, 2016
- Improved auto control ant colony optimization using lazy ant approach for grid scheduling problemFuture Generation Computer Systems, 2016
- Optimisation for offshore wind farm cable connection layout using adaptive particle swarm optimisation minimum spanning tree methodIET Renewable Power Generation, 2016
- Optimisation of offshore wind farm cable connection layout considering levelised production cost using dynamic minimum spanning tree algorithmIET Renewable Power Generation, 2016
- The impact of land use constraints in multi-objective energy-noise wind farm layout optimizationRenewable Energy, 2016
- Ant colony optimization algorithm based an intelligent protocol to improve QoS of MANETs2014
- Optimum Localization of Wind Turbine Sites Using Opposition Based Ant Colony Optimization2013
- Optimization of large-scale offshore wind farm electrical collection systems based on improved FCM2012