Scheduling manufacturing systems in an agile environment
Authors:
- 28 February 2001
- journal article
- Published by Elsevier in Robotics and Computer-Integrated Manufacturing
- Vol. 17 (1-2) , 87-97
Abstract
No abstract availableKeywords
This publication has 39 references indexed in Scilit:
- A competitive neural network approach to multi-objective FMS schedulingInternational Journal of Production Research, 1998
- Analysis of Classes of Heuristics for Scheduling a Two-Stage Flow Shop with Parallel Machines at One StageJournal of the Operational Research Society, 1995
- A scheduling algorithm for flexible flow lines with limited intermediate buffersApplied Stochastic Models and Data Analysis, 1993
- ROBOT SCHEDULING IN A CIRCUIT BOARD PRODUCTION LINE:A HYBRID OR/ANN APPROACHIIE Transactions, 1993
- Scheduling for minimizing total actual flow time by neural networksInternational Journal of Production Research, 1992
- Schedules for a two-stage hybrid flowshop with parallel machines at the second stageInternational Journal of Production Research, 1991
- Schedule generation and reconfiguration for parallel machinesIEEE Transactions on Robotics and Automation, 1990
- Two-Stage, Hybrid Flowshop Scheduling ProblemJournal of the Operational Research Society, 1988
- Evaluation of a MULTIFIT-based scheduling algorithmJournal of Algorithms, 1986
- Optimal two‐ and three‐stage production schedules with setup times includedNaval Research Logistics Quarterly, 1954