This article consists of a collection of slides from the author's conference presentation. Some of the specific areas/topics discussed include: the measured results appear to meet or exceed the expected in most if not all cases; the ASIM performance model (after some bug fixes and tuning) seems to be efficiently producing reliable and repeatable results; with over 100,000 aircraft and hundreds of millions of ADS-B messages received since 2/24/2017, there's still a lot more analysis and discovery ahead of us; and early results/analysis seems to indicate that 8s UI will be achievable in most if not all airspaces once the constellation is complete. Additional analysis underway to improve confidence towards that goal.efficiently.