An analytical method for accelerating calculations of the probability of power flows exceeding the tie-lines capacity
- 1 November 2018
- conference paper
- Published by Institute of Electrical and Electronics Engineers (IEEE)
- p. 1-6
Abstract
The paper presents a new approach for solving a part of adequacy problem- calculating the probability of power flows exceeding the tie-lines capacity The proposed method is based on Lagrange multipliers method applied to random values. Test results have shown a good accuracy of the proposed approach in case of using Monte Carlo simulation technique as a benchmark. The paper points out that the proposed method could significantly reduce the computation burden of Monte Carlo simulation technique and can be used in the solving power system development planning problem.Keywords
This publication has 8 references indexed in Scilit:
- A comprehensive sequential review study through the generation expansion planningRenewable and Sustainable Energy Reviews, 2017
- Data Constrained Adequacy Assessment for Wind Resource PlanningIEEE Transactions on Sustainable Energy, 2014
- Probabilistic Small-Disturbance Stability Assessment of Uncertain Power Systems Using Efficient Estimation MethodsIEEE Transactions on Power Systems, 2014
- Optimal passive filter planning considering probabilistic parameters using cumulant and adaptive dynamic clone selection algorithmInternational Journal of Electrical Power & Energy Systems, 2013
- A Probabilistic Load Flow Method Considering Branch OutagesIEEE Transactions on Power Systems, 2006
- Generating Capacity Adequacy Associated With Wind EnergyIEEE Transactions on Energy Conversion, 2004
- Reliability Assessment of Electric Power Systems Using Monte Carlo Methods1994
- Evaluation Methods and Accuracy in Probabilistic Load Flow SolutionsIEEE Transactions on Power Apparatus and Systems, 1981