Staged implementation of alternative processes in an existing integrated steel mill for improved performance and reduced CO2 emissions – Part I: Technical concept analysis
Authors:
- Kristin OnarheimKOKristin Onarheim
- Antti ArastoAAAntti Arasto
- 1 February 2016
- journal article
- Published by Elsevier in International Journal of Greenhouse Gas Control
- Vol. 45, 163-171
Abstract
No abstract availableKeywords
This publication has 5 references indexed in Scilit:
- Oxygen blast furnace with CO2 capture and storage at an integrated steel mill – Part II: Economic feasibility in comparison with conventional blast furnace highlighting sensitivitiesInternational Journal of Greenhouse Gas Control, 2015
- Oxygen blast furnace with CO 2 capture and storage at an integrated steel mill—Part I: Technical concept analysisInternational Journal of Greenhouse Gas Control, 2014
- Post-combustion capture of CO2 at an integrated steel mill – Part II: Economic feasibilityInternational Journal of Greenhouse Gas Control, 2013
- Post-combustion capture of CO2 at an integrated steel mill – Part I: Technical concept analysisInternational Journal of Greenhouse Gas Control, 2013
- Application of Advanced Technologies for CO2 Capture From Industrial SourcesEnergy Procedia, 2013