A risk dispatching model with Muskingum constraints for cascaded hydro systems
Authors:
- 16 April 2018
- journal article
- research article
- Published by Wiley in IEEJ Transactions on Electrical and Electronic Engineering
- Vol. 13 (8) , 1119-1126
Abstract
A risk dispatching model for short‐term cascaded hydro scheduling during high‐water season is proposed in this paper taking into consideration of uncertainty factors and the process of water flow. The uncertainty of natural inflow and market price is simulated by the multi‐scenarios method. The conditional value at risk (CVAR) is introduced to quantify the risk caused by these uncertainties. In the objective function, the added CVAR represents the risk preference of the hydropower producer. Based on the degree of risk aversion of the producer, the generation profit and risk are coordinated. In addition, the Muskingum model is used to formulate the process of water flow between upstream and downstream stations. A mixed‐integer linear programming model of short‐term cascaded hydro system scheduling in the high‐water season is developed and solved. Numerical studies demonstrate that the proposed approach can balance the risk and generation profit in the high‐water season and the model with the Muskingum constraint is more refined. © 2018 Institute of Electrical Engineers of Japan. Published by John Wiley & Sons, Inc.Keywords
Funding Information
- National Natural Science Foundation of China (51507100)
- Shanghai Municipal Education Commission
- Shanghai Education Development Foundation (14CG55)
This publication has 28 references indexed in Scilit:
- Nonlinear Medium-Term Hydro-Thermal Scheduling With Transmission ConstraintsIEEE Transactions on Power Systems, 2014
- Short-term optimal scheduling of a price-maker hydro producer in a pool-based day-ahead marketIET Generation, Transmission & Distribution, 2012
- Short term generation scheduling of cascaded hydro electric system using novel self adaptive inertia weight PSOInternational Journal of Electrical Power & Energy Systems, 2012
- Extended Muskingum method for flood routingJournal of Hydro-environment Research, 2011
- Stochastic programming for optimizing bidding strategies of a Nordic hydropower producerEuropean Journal of Operational Research, 2007
- Integrated risk management of hydro power scheduling and contract managementIEEE Transactions on Power Systems, 2001
- Parameter Estimation of Nonlinear Muskingum Models Using Genetic AlgorithmJournal of Hydraulic Engineering, 1997
- An optimization-based algorithm for scheduling hydrothermal power systems with cascaded reservoirs and discrete hydro constraintsIEEE Transactions on Power Systems, 1997
- Optimal short-term scheduling for a large-scale cascaded hydro systemIEEE Transactions on Power Systems, 1994
- River Flood Routing by Nonlinear Muskingum MethodJournal of Hydraulic Engineering, 1985