Abstract
Traditional approaches to managing changes in construction development projects are predominantly reactive, relying on manual progress tracking and heuristic decision-making, which often leads to significant cost overruns, schedule delays, and scope creep. This research addresses the critical need for a more predictive and data-driven management paradigm in the development of educational infrastructure. To overcome these limitations, this study develops and proposes a Method of proactive change management in development projects based on a Digital Twin (PCMM-DT). The research aim is to establish a closed-loop system where real-time site data, integrated via a Digital Twin (DT) and Building Information Modeling (BIM), allows for the dynamic simulation and mitigation of construction deviations before they disrupt project baselines. The core of the study is the development of a PCMM-DT method, which functions as an intelligent decision support system. The PCMM-DT method integrates a four-layer architecture – physical, digital twin, analytics, and action layers – to manage the project lifecycle. A PCMM-DT method algorithm was formulated to perform multi-objective optimization, balancing conflicting criteria such as lifecycle cost, functional utility, and project resilience. The evaluation is conducted using a PCMM-DT model for constraint handling, which validates proposed changes against geometric, safety, and quality standards. Furthermore, a PCMM-DT model for multi-objective fitness evaluation was constructed to quantify the impact of changes across economic, functional, and adaptability vectors. The application of the PCMM-DT method allows for the generation of a Pareto-optimal frontier, providing project managers with a robust, evidence-based ranking matrix for selecting the most appropriate mitigation strategies. This approach transforms the management of change orders from an adhoc process into a systematic, optimized workflow. The proposed PCMM-DT method represents a paradigm shift from reactive project governance to proactive, predictive management. By leveraging the PCMM-DT model for real-time analytics and decision support, project teams can identify deviations early, assess their impacts precisely, and select optimal configuration changes. This integration enhances the digital resilience of educational development projects, ensuring that capital investments remain aligned with both pedagogical objectives and budgetary constraints. Future research will focus on the empirical validation of the PCMM-DT method in large-scale infrastructure environments to further refine the predictive accuracy of the integrated digital twins.